Skip to content
BENJAMIN Strobel · Beyond the FrameGTM Bâtiment / VINCI Construction
Discover
Experience ←

2022–2023

GTM Bâtiment / VINCI Construction

Assistant site manager / occupied-building renovation

GTM Bâtiment / VINCI Construction, September 2022–February 2023: renovation follow-up in an occupied care home. The scene starts from a simplified plan of the existing building.

I planned and followed interventions, taking physical constraints and continuity of activity into account. Extrusion makes the model readable; it does not depict me constructing the entire building.

Structure, partitions and equipment share the same space. I coordinated practical information with contractors, consulted suppliers and followed costs and progress.

The layers reassemble to show their dependencies. My contribution was preparation and site follow-up, with adjustments to the work and its constraints.

For bespoke washbasins, I surveyed geometry and prepared templates to transmit the fabrication need. The visual explains measurement and handover, with no real project dimensions.

From preparation to handover.

The scenes illustrate the method with simplified geometry, not a real-site plan. My contribution is study, preparation and coordination, not the installation or construction of every object shown.